← All posts

— Tag

#transmission

8 posts tagged transmission.

#landledger (13) #fieldintel (11) #pointscout (9) #transmission (8) #crs (7) #data-centers (6) #mobile (5) #right-of-way (5) #ai (4) #market (4) #row (4) #theo (4) #data-quality (3) #gotchas (3) #records (3) #state-plane (3) #workforce (3) #bidding (2) #deliverables (2) #easements (2) #field-crews (2) #field-workflow (2) #heath (2) #indiana (2) #institutional-memory (2) #qc (2) #utilities (2) #agents (1) #alta (1) #android (1) #archive (1) #audit-report (1) #cooperatives (1) #cost-and-roi (1) #data (1) #datum (1) #datums (1) #desktop (1) #disputes (1) #documentation (1) #eminent-domain (1) #engineers (1) #epsg (1) #estimating (1) #feedback-loop (1) #ferc (1) #field (1) #field-to-finish (1) #field-work (1) #grain-belt (1) #ingest (1) #ios (1) #landxml (1) #leverage (1) #lifecycle (1) #local-grid (1) #miso (1) #monument-recovery (1) #nad83 (1) #natrf2022 (1) #nsps (1) #nsrs (1) #payments (1) #pnezd (1) #product-tour (1) #project-management (1) #prompt-engineering (1) #quality-control (1) #re-visit (1) #remc (1) #repeat-work (1) #roi (1) #standards (1) #survey (1) #survey-foot (1) #title-surveys (1) #trust (1) #units (1) #verification (1) #vlm (1)
— landledger

The Member-Owned Corridor

The data-center buildout has reached the electric cooperatives -- Indiana's G&Ts are permitting new substations and new miles of line, and the co-op associations are saying out loud what every member is thinking: the new load has to pay its own way. That puts co-op land departments in a position no one else in the industry occupies. They are building transmission for a utility owned by the people who live along the corridor -- with a fraction of the staff, and an audience for every dollar.

September 2026 · 6 min read
— landledger

$105 Million Before the First Tower

The Grain Belt Express headlines went to the $1.7 billion in construction contracts. The quieter number is the one that should interest anyone who runs land: more than $105 million in executed easement agreements before major construction begins -- about $19 million already paid to landowners, and another $86 million that falls due when the towers start going in. That second tranche is not a payment. It is a promise, spread across hundreds of tracts and several years -- and promises at that scale are only as good as the ledger that remembers them.

September 2026 · 5 min read
— landledger

The Grid's Schedule Moved Up Five Years

MISO's planners keep saying the same thing in different ways: the load is arriving early. Gigawatts of data centers landing in 2026 and 2027, demand running years ahead of the projections the current plans were built on, and an $8.8 billion transmission plan headed for a board vote. Engineering schedules can compress when the money shows up. The land-rights schedule cannot -- it runs on title chains, kitchen-table negotiations, and county recording offices. Which means the parcel work just became the critical path, and the utilities that treat it that way will be the ones that hit their dates.

August 2026 · 5 min read
— row

The Grid's Bottleneck Has a Farmhouse on It

The largest transmission buildout in a generation is not bottlenecked by money or by engineering. It is bottlenecked by land -- and the land is fighting back. The flagship Midwest line has been at it since 2010, has filed more than forty eminent-domain petitions in a single state, collected easements landowners signed begrudgingly, and just lost a $4.9 billion federal loan. Meanwhile the federal 'backstop' meant to speed siting along cannot legally be used, because the corridors it depends on have never been finalized. Which means every mile still comes down to acquisition, parcel by parcel, one increasingly reluctant landowner at a time.

July 2026 · 6 min read
— market

There Aren't Enough Surveyors for the Grid We're About to Build

The country has committed tens of billions of dollars to the largest transmission expansion in a generation, and every mile of it needs control, boundary work, and easements before a single tower goes up. That demand is landing on a profession that has been shrinking for fifteen years: roughly 48,000 licensed surveyors, an average age near 58, and about a thousand new graduates a year against a retirement wave. Put the two curves on the same chart and they do not meet. Here is the arithmetic -- and the only lever the profession actually has left.

July 2026 · 6 min read
— row

The Agreement That Went Silent

The parcel that blows a right-of-way schedule is almost never the one you're fighting over. It's the easy one that went quiet -- an offer went out, the owner didn't sign, nobody was counting the days, and three weeks quietly became three months. Here's why the silent stall is the most expensive failure mode in ROW acquisition, why a line list can't see it coming, and what it takes to catch it before it costs you the in-service date.

July 2026 · 7 min read
— ferc

What FERC's Data-Center Orders Mean for the Land-Rights Desk

On June 19 FERC issued six orders telling the country's regional grid operators to write new rules for how data centers plug into the grid. Read quickly, they look like procedural homework for grid engineers. Read closely, they are about three things -- cost, accountability, and documentation -- and all three eventually land on the desk of the people who acquire the land a transmission line has to cross. Here is what the orders say, and why the right-of-way workload behind the data-center buildout just got more scrutinized, not less.

June 2026 · 8 min read
— row

What 2.2 GW Means for Land Rights

AWS announced an Indiana data center campus that needs 2.2 gigawatts -- roughly half the electricity all Indiana households use combined. That power has to come from somewhere, and it has to travel over wires that don't exist yet. Behind the data-center buildout sits a transmission expansion of historic scale, and behind that sits a less-talked-about bottleneck: every mile of new line requires parcel-by-parcel land rights work. The shape of the market that's about to need ROW software is not the shape the incumbents were built for.

June 2026 · 8 min read

Get new posts in your inbox

Roughly weekly. No filler. Unsubscribe with one click.